Construction Manager/General Contractor project delivery method: Department of Transportation.
It became law on Sep 17, 2018.
- Stage
- Became law
- Started in
- Senate
- Sponsor
- 1
- Latest action
- Sep 17, 2018
What it does
Existing law authorizes the Department of Transportation to engage in a Construction Manager/General Contractor project delivery method (CM/GC method) , as specified, for projects for the construction of a highway, bridge, or tunnel. Existing law authorizes the department to use the CM/GC method on up to 12 projects, 10 of which are required to have construction costs greater than $10,000,000. Existing law also authorizes the department to enter into a contract using this method on 12 additional projects, 2 of which are required to be authorized for projects in the County of Riverside, as prescribed.
Where it stands
This bill passed and is now law.
Introduced (Done)
Committee (Done)
Floor (Done)
Law (Done)
What moved
Who is involved
Sponsors
The lawmakers who put their names on it, lead sponsors first.
In the news
Reporting that may mention this subject. Possible matches are labeled.
Loading coverage…
Where it goes next
Once a bill is decided, the questions are about what is done with it in California.