Skip to content

Onsite sewage system designs; Board of Health to establish a pre-certified library of designs, etc.

Introduced: it can still change before the session ends.

VA HB 1424 · House Bill · 2027

Stage
Introduced
Started in
House
Sponsors
Latest action
Jul 21

What it does

Department of Health; Board of Health; powers and duties; onsite sewage system designs. Directs the Board of Health to establish and maintain a pre-certified library of engineered onsite sewage system designs that may be used by right when site conditions materially match the design envelope for such systems. The bill also directs the Department of Health, in coordination with the Department of Environmental Quality, to implement a fast-track permitting timeline for subdivision plat review when a subdivision will have identical, decentralized onsite sewage system designs. Within 30 days from the date of written submission of a request for approval of a site evaluation and design for subdivision plat review, the Department of Health shall (i) issue the requested letter, permit, or approval or (ii) set forth in writing the specific reasons for denial.

Read the full text

Where it stands

  1. Introduced (Current step)

    Introduced · Jul 21

  2. Committee (Not started)

  3. Floor (Not started)

  4. Law (Not started)

What moved

Loading recorded actions…

Who is involved

Sponsors

The lawmakers who put their names on it, lead sponsors first.

In the news

Reporting that may mention this subject. Possible matches are labeled.

Loading coverage…

Where it goes next

While a bill can still move, the questions are about people and money in Virginia.

Work with this bill

Onsite sewage system designs; Board of Health to establish a pre-certified library of designs, etc. | 52