Skip to content

Pumped hydropower system: pilot project.

This bill did not become law and its session has ended, so it can no longer move. It would have to be reintroduced.

CA SB 597 · Senate Bill · 2019–2020

Stage
Session ended
Started in
Senate
Sponsor
1
Latest action
Feb 3, 2020

What it does

Existing law requires the Public Utilities Commission to open a proceeding to determine appropriate targets, if any, for each load-serving entity, including electrical corporations, to procure viable and cost-effective energy storage systems, to be achieved by December 31, 2015, and December 31, 2020. If determined to be appropriate, the commission is required to adopt the procurement targets by October 1, 2013, and to reevaluate the determinations not less than once every 3 years.

Read the full text

Where it stands

This bill did not become law and its session has ended, so it can no longer move. It would have to be reintroduced.

  1. Introduced (Current step)

    Introduced · Feb 3, 2020

  2. Committee (Needs attention)

    The session ended first

  3. Floor (Not started)

  4. Law (Not started)

What moved

Loading recorded actions…

Who is involved

Sponsors

The lawmakers who put their names on it, lead sponsors first.

In the news

Reporting that may mention this subject. Possible matches are labeled.

Loading coverage…

Where it goes next

While a bill can still move, the questions are about people and money in California.

Work with this bill

Pumped hydropower system: pilot project. | 52