Skip to content

Net energy metering: fuel cell electrical generating facilities.

This bill did not become law and its session has ended, so it can no longer move. It would have to be reintroduced.

CA AB 2075 · Assembly Bill · 2011–2012

Stage
Session ended
Started in
Assembly
Sponsor
1
Latest action
Aug 13, 2012

What it does

Existing law establishes a net energy metering program that is available to an eligible fuel cell customer-generator, as defined. The existing definition of an eligible fuel cell customer-generator requires that the customer use a fuel cell electrical generating facility with a capacity of not more than one megawatt that is located on or adjacent to the customer's owned, leased, or rented premises, is interconnected to, and operates in parallel with, the electrical grid while the grid is operational or in a grid independent mode when the grid is nonoperational, and is sized to offset part or all of the eligible fuel cell customer-generator's own electrical requirements.

Read the full text

Where it stands

This bill did not become law and its session has ended, so it can no longer move. It would have to be reintroduced.

  1. Introduced (Done)

  2. Committee (Done)

  3. Floor (Current step)

    Passed first chamber · Aug 13, 2012

  4. Law (Needs attention)

    The session ended first

What moved

Loading recorded actions…

Who is involved

Sponsors

The lawmakers who put their names on it, lead sponsors first.

  • FongLead sponsor

In the news

Reporting that may mention this subject. Possible matches are labeled.

Loading coverage…

Where it goes next

While a bill can still move, the questions are about people and money in California.

Work with this bill

Net energy metering: fuel cell electrical generating facilities. | 52