Net energy metering: eligible fuel cell customer-generators.

It became law on Sep 27, 2012.

CA AB 2165 · Assembly Bill · 2011–2012

Stage
Became law
Started in
Assembly
Sponsors
2
Latest action
Sep 27, 2012

What it does

Under existing law, the Public Utilities Commission has regulatory authority over public utilities, including electrical corporations, as defined. Existing law, relative to private energy producers, requires every electrical corporation to make available to an eligible fuel cell customer-generator, as defined, a standard contract or tariff for net energy metering on a first-come-first-served basis until the total cumulative rated generating capacity used by the eligible fuel cell customer-generators equals 45 megawatts within the service territory of the electrical corporation, for an electrical corporation with a peak demand above 10,000 megawatts, or equals 22.5 megawatts within the…

Read the full text

Where it stands

This bill passed and is now law.

  1. Introduced (Done)

  2. Committee (Done)

  3. Floor (Done)

  4. Law (Done)

    Sep 27, 2012

What moved

Loading recorded actions…

Who is involved

Sponsors

The lawmakers who put their names on it, lead sponsors first.

Where it goes next

Once a bill is decided, the questions are about what is done with it in California.

Work with this bill

Net energy metering: eligible fuel cell customer-generators. | 52