Skip to content

Public contracts: local water infrastructure projects: Construction Manager/General Contractor project delivery method.

It became law on Oct 11, 2025.

CA SB 598 · Senate Bill · 2025–2026

Stage
Became law
Started in
Senate
Sponsor
María Elena Durazo
Latest action
Oct 11, 2025

What it does

Existing law defines the Construction Manager/General Contractor project delivery method (CM/GC method) as a project delivery method in which a construction manager is procured to provide preconstruction services during the design phase of a project and construction services during the construction phase of the project. Under existing law, the method allows the contract for construction services to be entered into at the same time as the contract for preconstruction services or at a later time. Existing law authorizes the Metropolitan Water District of Southern California to utilize the CM/GC method for regional recycled water projects or other water infrastructure projects under specified…

Read the full text

Where it stands

This bill passed and is now law.

  1. Introduced (Done)

  2. Committee (Done)

  3. Floor (Done)

  4. Law (Done)

    Oct 11, 2025

What moved

Loading recorded actions…

Who is involved

Sponsors

The lawmakers who put their names on it, lead sponsors first.

In the news

Reporting that may mention this subject. Possible matches are labeled.

Loading coverage…

Where it goes next

It is law in California. What happens now is up to the agency that carries it out, the courts, and the place itself.

Work with this bill

Public contracts: local water infrastructure projects: Construction Manager/General Contractor project delivery method. | 52