Skip to content

Power facilities: emergency response and action plans.

It was vetoed on Jan 22, 2026.

CA AB 615 · Assembly Bill · 2025–2026

Stage
Vetoed
Started in
Assembly
Sponsors
Latest action
Jan 22, 2026

What it does

Existing law requires an application to be filed with the State Energy Resources Conservation and Development Commission for certification of a site and related facility that includes an electrical transmission line or thermal powerplant, or both. Existing law requires the application to contain, among other information, a description of any electrical transmission lines, a map of the proposed route and existing transmission lines, justification for the proposed route, and a preliminary description of the effect of the proposed electrical transmission lines on the environment, ecology, and scenic, historic, and recreational values, as specified.

Read the full text

Where it stands

This bill failed and is no longer moving.

  1. Introduced (Done)

  2. Committee (Done)

  3. Floor (Done)

  4. Law (Needs attention)

    Vetoed

What moved

Loading recorded actions…

Who is involved

Sponsors

The lawmakers who put their names on it, lead sponsors first.

In the news

Reporting that may mention this subject. Possible matches are labeled.

Loading coverage…

Work with this bill

Power facilities: emergency response and action plans. | 52