Skip to content
52Nov 3 election

17.10.200 - Sidewalks, Trails, and Bike Paths.

Part of the Code of Ordinances of South Salt Lake, UT.

Local law · Updated May 27, 2026 · 1,732 sections

The text

The following are required Improvements: A.

Sidewalks, Landscaping, bike lanes, curb, and gutter, shall be included within the Dedicated Right-of-Way of all roads, consistent with the applicable road profile, unless an alternate location has been specifically recommended by the City Engineer and approved by the Planning Commission.

B.

Trails, pedestrian paths, and bike paths shall relate appropriately to topography, require a minimum of Site disturbance, permit efficient drainage, and provide safe Access.

C.

Trails, pedestrian paths, and bike paths shall be provided by the Applicant in accordance with the Trails Master Plan and where otherwise necessary as determined by the Planning Commission. Trails should connect traffic generators such as schools, recreation facilities, commercial Areas, parks, and other significant natural features. Such trails shall be built to City specifications and easements shall be Dedicated for such trails. The trails shall be constructed at the time of road construction.

(Ord. No. 2020-02, § IV(Exh. C), 1-8-2020; Ord. No. 2023-27, § 1(Exh. A), 9-12-2023)