TITLE 11: - SUBDIVISION DEVELOPMENT AND REGULATIONS

Part of the Code of Ordinances of Honeyville, UT.

Local law · Updated June 3, 2026 · 710 sections

The text

Footnotes:

--- (1) --- Editor's note— Ord. No. 2025-01, § 1 (Att. A.), adopted June 19, 2025, repealed the former Title 11, in its entirety, and enacted a new Title 11 as set out herein. The former Title 11 pertained to temporary ordinances and derived from Ord. 2007-01 adopted Jan. 10, 2007.

CHAPTER 1: - GENERAL#

11-1-1: - Short title#

This Title shall be known and referred to as the "Subdivision Ordinance of Honeyville City, Utah" or the "Subdivision Ordinance" and may be so cited and pleaded.

(Adopted by Ord. 2025-01 on 6/19/2025)

11-1-2: - Authority#

This Title is adopted pursuant to the Municipal Land Use Development and Management Act, § 10-9a of Utah State Code, and the police power authority of local government as established by Utah common law.

(Adopted by Ord. 2025-01 on 6/19/2025)

11-1-3: - Purpose#

The purposes of this Title are to:

A.

Provide for the health, safety, and welfare;

B.

Promote the prosperity;

C.

Improve the morals, peace, good order, comfort, convenience, and aesthetics of the City and its present and future inhabitants and businesses;

D.

Protect the tax base;

E.

Secure the economy in governmental expenditures;

F.

Foster the City's agricultural and other industries;

G.

Protect both urban and nonurban development;

H.

Protect and ensure access to sunlight for solar energy devices;

I.

Provide fundamental fairness in land use regulation;

J.

Protect property values; and

K.

Comply with Utah Code (notably § 10-9a-6).

(Adopted by Ord. 2025-01 on 6/19/2025)

11-1-4: - Scope#

Except as otherwise provided this Title shall apply to all property within the corporate limits of the City except property expressly exempted therefrom by the provisions of this Title or other lawful exemption.

(Adopted by Ord. 2025-01 on 6/19/2025)

11-1-5: - Applicable provisions not in this Title#

A.

This Title and all of its provisions apply to all subdivision applications and petitions.

B.

The requirements of this Title do not apply retroactively to subdivision applications or petitions that were approved by the City prior to the enactment of this ordinance.

C.

All master or general plans adopted by the City or for an area within the incorporated boundaries of the City shall serve as an advisory guide for subdivision decisions. Amendments to the text of this ordinance shall be consistent with the purposes, goals, objectives, and policies of the applicable adopted master plans or general plans of the City.

D.

Code provisions not found in this Title applicable to the use and development of land include, but are not limited to, the following:

1.

Title 8, "Water Regulations", of this code;

2.

Title 9, "Building Regulations", of this code.

3.

Title 10, "Land Use", of this code.

4.

Title 12, "Flood Control", of this code.

(Adopted by Ord. 2025-01 on 6/19/2025)

11-1-6: - Enactment of ordinances, resolutions, and development agreements; interpretation#

A.

To accomplish the purposes of this Title, the City may enact all ordinances, resolutions, and rules and may enter into other forms of land use controls and development agreements that the City considers necessary or appropriate for the use and development of land within the City, including ordinances, resolutions, rules, restrictive covenants, easements, and development agreements governing: uses; density; open spaces; structures; buildings; energy efficiency; light and air; transportation and public or alternative transportation; infrastructure; street and building orientation; width requirements; public facilities; fundamental fairness in land use regulation; and considerations of surrounding land uses to balance the forgoing purposes with a landowner's private property interests and associated statutory and constitutional protections.

B.

In interpreting and applying this Ordinance, the requirements in this document are minimum requirements.

(Adopted by Ord. 2025-01 on 6/19/2025)

11-1-7: - Approved and recorded documents required#

A.

No land shall be subdivided which is located wholly or in part in the City, except in compliance with this Title and Utah Code as adopted and amended.

B.

A subdivision of land is not valid unless its governing document is approved by the Land Use Authority and properly recorded in the County Recorder's Office.

(Adopted by Ord. 2025-01 on 6/19/2025)

11-1-8: - Penalty for noncompliance#

It is unlawful to transfer ownership of any parcel of land pursuant to an invalid subdivision. The City may, in its discretion, void such transfers and impose on the transferor a class C misdemeanor.

(Adopted by Ord. 2025-01 on 6/19/2025)

11-1-9: - Validity#

Should any Section, Clause, or Provision of this Title be declared by a court of competent jurisdiction to be invalid, the same shall not affect the validity of this Title as a whole or any part hereof other than the part specifically so declared to be invalid.

(Adopted by Ord. 2025-01 on 6/19/2025)

11-1-10: - Interpretation and conflict of laws#

The interpretive rules of 10-3-3 of the Land Use Title shall apply to the interpretation of this Title. Where any provision in this Subdivision Title conflicts with State Law, State Law shall prevail. Where any provision in this Subdivision Title conflicts with other ordinances enacted by the City, the provisions in this Subdivision Title shall prevail unless the City intended such conflicting ordinances not in this Title to amend this Title.

(Adopted by Ord. 2025-01 on 6/19/2025)

CHAPTER 2: - DEFINITIONS#

11-2-1: - Definitions of words and phrases#

See Section 10-3-4: Definitions of words and phrases.

(Adopted by Ord. 2025-01 on 6/19/2025)

CHAPTER 3: - LAND USE AND APPEAL AUTHORITIES#

11-3-1: - Purpose; designation of land use authority#

A.

The purpose of this Chapter is to set forth the Land Use and Appeal Authorities responsible for administering the provisions of this Title.

B.

Table 1 designates the Land Use Authority and Appeal Authority for subdivision approvals and appeals, respectively, within the City. The Land Use Authority shall apply the plain language of subdivision regulations. If a subdivision regulation does not plainly restrict a subdivision application, the Land Use Authority shall interpret and apply the subdivision regulation to favor the subdivision application.

C.

All appeals under this Title shall proceed under the authority of the Hearing Officer as described in 10-4-5 of the Land Use Title.

(Adopted by Ord. 2025-01 on 6/19/2025)

11-3-2: - Land use authority#

A.

The Land Use Authority for preliminary subdivision applications is the Planning Commission. For purposes of subdivision applications, the Planning Commission shall be ultimately responsible for the following, but may delegate any task to the City Engineer, City Staff, Zoning Administrator, or members of the Planning Commission:

1.

Rendering land use decisions related to preliminary applications under this Chapter, including approving or denying preliminary applications.

2.

Reviewing all preliminary applications under this Chapter in an impartial manner and according to the standards and deadlines described in this Chapter. This task is delegated to the Zoning Administrator by default.

3.

Scheduling and holding a pre-application meeting with potential applicants as required by this Chapter. This task is delegated to the Zoning Administrator by default.

4.

Keeping subdivision application forms (both preliminary and final) and related informational material up to date and publicly accessible and distributing such forms and materials to potential applicants. This task is delegated to City Staff by default.

B.

The Land Use Authority for final subdivision applications is the Development Review Committee (DRC). The DRC shall comprise one member of the Planning Commission, the Zoning Administrator, the Public Works Director, and the City Engineer; the DRC shall meet on an as-needed basis and shall act upon the agreement of at least three members. The City Attorney may participate in DRC meetings or advise the DRC on an as-needed basis. For purposes of subdivision applications, the DRC shall be responsible for the following, but may delegate any task to the City Engineer, City Staff, or members of the DRC:

1.

Rendering land use decisions related to final applications under this Chapter, including approving or denying final applications.

2.

Reviewing all final applications under this Chapter in an impartial manner and according to the standards and deadlines described in this Chapter.

3.

Providing feedback to applicants on their final applications in the manner required by this Chapter.

4.

Providing notice to entities and parties as required by this Chapter.

5.

Signing final application approvals as required by this Chapter.

6.

Ensuring that documents are properly recorded with the County as required by this Chapter.

C.

As subdivision application decisions are administrative, not legislative, the Land Use Authority is authorized to make any land use decision described by this Chapter without City Council approval.

D.

Except when operating as the Appeal Authority, or amending a subdivision, the City Council shall not require the Land Use Authority to approve or deny an application under this Chapter.

(Adopted by Ord. 2025-01 on 6/19/2025)

11-3-3: - Appeal authority#

A.

The Appeal Authority for City decisions relating to this Chapter, except where otherwise noted, is the Hearing Officer.

B.

The Appeal Authority for City Council decisions relating to this Title, except where otherwise noted, is the District Court.

C.

The Appeal Authority shall hear appeals on final decisions made by the Land Use Authorities and shall hear complaints about the conduct of the Land Use Authorities in administering the provisions of this Chapter.

D.

A party appealing or complaining of a Land Use Authority's decision under this Chapter must exhaust its remedies under this Section (by appealing or complaining to the Appeal Authority) before bringing an action against the City in a court of law.

E.

A party who has submitted a subdivision application or petition may appeal or complain to the Appeal Authority under this Chapter. In such an appeal or complaint, the party may appeal or complain only regarding the Land Use Authority's treatment of that party's own application; a third party may not appeal or complain of Land Use Authority decisions or conduct.

F.

A party desiring to appeal or complain of a Land Use Authority decision shall submit to the Appeal Authority the following in writing:

1.

A brief explanation of the relief the party is seeking, the reason the party submitted its application or petition, the Land Use Authority's decision and treatment of the application or petition, and why the applicant believes the Land Use Authority misapplied the provisions of this Chapter or abused the discretion given it by this Chapter.

2.

The most recent version of the application or petition the party submitted.

3.

Any supplemental documentation or information that the Appeal Authority requests.

4.

All appeals and complaints must be emailed or mailed to the City Clerk using the Clerk's official City address and/or email account listed on the City website.

G.

After receiving a complete appeal or complaint in accordance with this Section, the Appeal Authority shall deliver a decision to the applicant, in writing, no later than 30 calendar days after the Appeal Authority receives the appeal or complaint.

Type of Application Reviewing Body Recommending Body Land Use Authority Appeal Authority

Development Agreement DRC Planning Commission City Council District Court

Lot Line Adjustment City Staff N/A DRC Hearing Officer / District Court

Subdivision Amendment City Staff DRC Planning Commission Hearing Officer / District Court

Variance N/A N/A Hearing Officer District Court

All Other Uses

Pre-Application Meeting

(upon request) DRC N/A N/A N/A

Preliminary Plat City Staff DRC Planning Commission Hearing Officer / District Court

Final Plat City Staff N/A DRC Hearing Officer / District Court

(Adopted by Ord. 2025-01 on 6/19/2025)

CHAPTER 4: - APPLICATION PROCEDURES AND REQUIREMENTS#

11-4-1: - Pre-application meeting#

A.

A pre-application meeting provides prospective subdivision applicants with an overview of the City's development application processes, as well as an opportunity to discuss and review conceptual development proposals with the Development Review Committee (DRC).

B.

If a party requests a pre-application meeting,

1.

Party shall submit a complete and signed request form and concept plan that includes the following:

a.

Approximate existing property boundaries;

b.

Approximate existing and proposed street rights-of-way;

c.

Approximate proposed lot layout;

d.

Current zoning/intended use; and

e.

Possible geologic hazards/sensitive lands.

2.

City Staff shall schedule the meeting within 15 business days after the request is received. The meeting shall be held at the earliest convenient opportunity.

3.

The DRC shall conduct the meeting, provide feedback on materials as requested by the party, and shall provide or have available on the City website the following at the time of the meeting:

a.

Copies of applicable land use regulations,

b.

A complete list of standards required for the project, and

c.

Relevant application checklists.

(Adopted by Ord. 2025-01 on 6/19/2025)

11-4-2: - Subdivision application process and requirements#

A.

The City shall not approve, nor shall a party record, any plat or other creating instrument for a new subdivision unless the party has properly applied under this Chapter and received both a preliminary approval and a final approval from the respective Land Use Authorities.

B.

Preliminary Subdivision Application

1.

To be considered complete, a preliminary subdivision application submittal shall include all items listed on the city-approved Preliminary Subdivision Application Submittal Checklist.at least the following elements:

2.

A preliminary subdivision application shall expire one (1) year after its initial submittal unless an extension is granted in writing by the Zoning Administrator for no more than six (6) additional months.

3.

If a final subdivision application is not submitted within one (1) year of notice of the preliminary subdivision approval, the preliminary subdivision approval shall expire.

C.

Final Subdivision Application

1.

A final subdivision application may be submitted upon the approval of the corresponding preliminary subdivision application.

2.

To be considered complete, a final subdivision application submittal shall include all items listed on the city-approved Final Subdivision Application Submittal Checklist.

3.

A final subdivision application shall expire six (6) months after its initial submittal unless an extension is granted in writing by the Zoning Administrator for no more than six (6) additional months.

D.

The Land Use Authority shall produce, maintain, and make available to the public a list of the specific items that comprise complete preliminary and final applications and a breakdown of any fees due upon submission or approval of the applications.

E.

The Land Use Authority may require, and the applicant shall provide, additional information beyond the requirements of this Section or those published by the City relating to an applicant's plans to ensure compliance with City ordinances and approved standards and specifications for construction of public improvements and to protect the health and safety of City residents.

(Adopted by Ord. 2025-01 on 6/19/2025)

11-4-3: - Notice to affected entities#

A.

Within 15 calendar days after receiving a complete subdivision application under this Chapter, the Zoning Administrator or designee shall provide written notice of the proposed subdivision to the facility owner of any known water conveyance facility located, entirely or partially, within 100 feet of the subdivision plat.

1.

To determine whether any water conveyance facility is located within 100 feet of a proposed subdivision, the Zoning Administrator or designee shall review information:

a.

From the facility owner under Utah Code § 10-9a-211, using mapping-grade global positioning satellite units or digitized data from the most recent aerial photo available to the facility owner;

b.

From the State Engineer's Inventory of Canals; or

c.

From a licensed surveyor who has consulted with a representative of an existing water conveyance facility that services an area near the land the application concerns.

B.

To give water conveyance facilities time to provide feedback on subdivision applications, the Land Use Authority shall not approve a preliminary (or related final) subdivision application under this Chapter sooner than 20 calendar days after the applicant submits a complete application. This waiting period does not apply to revised applications the applicant may submit during the application review process.

1.

A water conveyance facility owner's failure to provide comments to the Land Use Authority about a subdivision application does not affect or impair the Land Use Authority's authority to approve the subdivision application.

(Adopted by Ord. 2025-01 on 6/19/2025)

11-4-4: - Review processes#

A.

The respective Land Use Authorities shall review all subdivision applications in accordance with the requirements of this Section before approving or denying those applications.

B.

For both preliminary and final applications, the review process begins when an applicant submits a complete application.

1.

The Land Use Authorities shall not review an incomplete subdivision application, except to determine whether the application is complete.

2.

If the Land Use Authorities determine that an application is incomplete, it shall notify the applicant of the incompleteness, highlighting any insufficiencies and explaining that the application will not be reviewed until it is complete.

C.

For both preliminary and final applications, after the applicant submits a complete application, the Land Use Authorities shall review and provide feedback to the applicant in a series of "review cycles."

1.

A review cycle consists of the following phases:

a.

Phase #1: The applicant submits a complete application (or, if after the first cycle, submits a revised version of the complete application).

b.

Phase #2: The Land Use Authorities review the application in detail and assess whether the application conforms to local ordinances.

c.

Phase #3: The Land Use Authorities respond to the applicant, citing any missing requirements or areas of noncompliance and providing a detailed list of necessary revisions to the applicant. For any required modification or addition to the application or request for more information, the Land Use Authorities shall be specific and include citations to ordinances, standards, or specifications that require the modification or addition and shall provide the applicant with an index of all requested modifications or additions.

d.

Phase #4: The applicant revises the application, addressing each comment or requirement the Land Use Authorities made. The applicant must submit both revised plans and a written explanation in response to the municipality's review comments, identifying and explaining the applicant's revisions and reasons for declining to make revisions, if any. If the applicant fails to respond to a comment made by the Land Use Authorities in its review, the review cycle is not complete and will remain open until the applicant addresses all comments.

Table A - Review Cycles, Hearings, and Timelines by Subdivision Stage

Use Type Approval Stage Max Review Cycles Max Public Hearings City Turnaround Deadline*

All Uses Preliminary 4 1 30 Business Days

Final 1 0 30 Business Days

*Describes the total time (per review cycle) the City may take to complete both Phase #2 and Phase #3 unless as described in paragraph D.3 below.

D.

A Land Use Authority (and other City representatives or agents) shall adhere to the maximum number of review cycles and the review deadlines described in Table A, except as described below. If no further revisions are needed, a Land Use Authority may end the review process early and approve or deny the preliminary or final application.

1.

This provision notwithstanding, for any subdivision application that affects property within an identified geological hazard area, the City is exempt from limits on the number of permitted review cycles and the City's deadlines for reviewing and responding (Phases #2 and #3).

2.

If the applicant makes a material change to a preliminary or final application not requested by the City at any point in the review process, the Land Use Authority may restart the review process, but only with respect to the portion of the application that the material change substantively affects.

3.

For both preliminary and final applications, if an applicant takes longer than 40 business days to submit a revised application and respond to the City's requests for modifications and additions (Phases #1 and #4), the City shall have an additional 20 business days to review and respond to the revised application (Phases #2 and #3 of the next review cycle or issuing an approval decision).

4.

For preliminary applications, if an applicant takes longer than 180 calendar days to submit a revised application and respond to the City's requests for modifications and additions (Phases #1 and #4), the application shall, at the option of the Land Use Authority, expire. If an application expires, the applicant must restart the subdivision application process.

E.

When a preliminary or final application's review period ends, the Land Use Authority shall approve or deny the respective preliminary or final application within 20 business days.

1.

If the Land Use Authority has not approved or denied the application within 20 business days after the allotted review cycles are complete, the applicant may request a decision. After such a request, the municipality shall, within 10 business days:

a.

For a dispute arising from the subdivision improvement plans, assemble an appeal panel in accordance with Utah Code §10-9a-508(5)(d) to review and approve or deny the revised set of plans; or

b.

For a dispute arising from the subdivision ordinance review, advise the applicant, in writing, of the deficiency in the application and of the right to appeal the determination to the designated Appeal Authority.

F.

After the Land Use Authority provides comments in the last allotted review cycle for a final application, the City shall not require further modifications or corrections to the application unless those modifications or corrections are necessary to protect public health and safety or to enforce State or federal law or unless the review cycle reset due to the applicant making a material change that the Land Use Authority did not request.

1.

With the exception of modifications or corrections that are needed to protect public health and safety, that are needed to enforce State or federal law, or that arise from the review cycle being reset, the municipality waives noncompliant subdivision-related requirements that the Land Use Authority does not identify during the review process.

2.

The applicant shall make reasonable changes, unless prohibited otherwise by a contract or deed, to the subdivision application to accommodate the water conveyance facility to the extent required by Utah Code § 73-1-15.5.

G.

The Planning Commission shall hold a public hearing during the review period for a preliminary subdivision application.

1.

The purpose of these public hearings is to ask questions of the applicant and receive commentary on the technical aspects of the application from affected entities, interested parties, and the public.

2.

The hearing must occur before the end of the Land Use Authority's preliminary review period (end of Phase #3 of the last preliminary review cycle). Scheduling issues shall not extend the review and approval deadlines in this Chapter.

3.

The municipality shall not hold a public hearing during the review period for a final application under this Chapter.

H.

Other Sections of this Title notwithstanding, the Land Use Authorities shall approve or deny preliminary and final applications under this Chapter after reviewing the complete applications as described in this Section.

(Adopted by Ord. 2025-01 on 6/19/2025)

11-4-5: - Approval#

A.

The Land Use Authorities shall approve any complete preliminary and final applications made under this Chapter that comply with applicable municipal ordinances.

B.

The Land Use Authorities shall issue all approvals in writing and shall certify the approved final plat, either by signing the plat directly or by attaching a signed certification to the plat.

(Adopted by Ord. 2025-01 on 6/19/2025)

11-4-6: - Post-approval actions#

A.

The City shall record the approved final plat with the County Recorder's Office within one (1) year after the City approves the final application, provided that the applicant has completed any improvements or posted any improvement guarantee required by City ordinances or described in the approved improvement plan. The plat shall not be recorded until such improvements are completed or guaranteed in compliance with City ordinances and the approved improvement plan.

1.

An approved final plat not properly recorded within the timeline specified in this provision is void, unless the Development Review Committee approves an extension of not more than one (1) year.

B.

City Staff shall submit to the Utah Geospatial Resource Center, within 30 calendar days after the final application has been approved, either:

1.

An electronic copy of the approved final plat; or

2.

Preliminary geospatial data that depict any new streets and situs addresses proposed for construction within the bounds of the approved final plat.

(Adopted by Ord. 2025-01 on 6/19/2025)

11-4-7: - Plat exemptions#

AGRICULTURAL LAND EXEMPTION/PROCESS

A.

Requirements for Exemption.

1.

A lot or parcel resulting from a division of agricultural lands is exempt from plat requirements if the lot or parcel:

a.

Qualifies as land in agricultural use; and

b.

Meets the minimum size requirements of applicable land use ordinances; and

c.

Is not used and will not be used for any nonagricultural purpose.

2.

The boundaries of each lot or parcel exempted shall be graphically illustrated on a record of survey map that, after receiving the same approvals as are required for a plat under Subdivision Applications, shall be recorded with the County Recorder.

3.

If a lot or parcel exempted under this Section is used for a nonagricultural purpose, the municipality shall require the lot or parcel to comply with the requirements of a full plat application.

B.

Process.

1.

A private individual or the City itself may request an agricultural land exemption.

a.

Whoever requests the exemption shall hereinafter be referred to as the petitioner.

2.

The petitioner prepares the record of the survey map as explained under Requirements for Exemption.

a.

The record of the survey map makes up the petition.

I.

The petitioner then files the petition with the Land Use Authority.

II.

The Land Use Authority reviews the petition to ensure that it complies with the Requirements for Exemption.

III.

If the Land Use Authority finds that any of the requirements are not met, the Land Use Authority may deny the exemption in a writing, specifying its reasons for doing so.

A.

If the petition is denied due to deficiencies which can be corrected, the petitioner may make modifications and re-petition.

B.

If the petition is denied due to deficiencies which cannot be corrected, the petitioner should not re-petition.

3.

If the Land Use Authority finds that all requirements are met, the Land Use Authority shall send the petition with a certificate of written approval to the City Council with a recommendation that they approve the petition.

4.

The City Council shall approve the petition and ensure that it is recorded by the County Recorder's Office.

a.

Documents recorded in the County Recorder's Office that divide property by a metes-and-bounds description do not create an approved subdivision under this exemption unless the Land Use Authority's certificate of written approval required for the exemption to apply is attached to the document.

b.

The City Council shall ensure that the Land Use Authority's certificate of written approval is attached to the petition and included when the petition is recorded.

(Adopted by Ord. 2025-01 on 6/19/2025)

11-4-8: - Plat exemptions - minor subdivision#

Reserved

11-4-9: - Vacating and amending subdivisions#

A.

Vacating a Subdivision or Street: The Planning Commission may vacate a subdivision or a portion of a subdivision by enacting an ordinance to that effect that describes the subdivision or the portion being vacated and recording that ordinance in the County Recorder's Office.

B.

Immaterial Plat Amendments: A property owner or agent of a property owner may correct minor typographical or clerical errors in a document of record by filing with the County an affidavit or other appropriate instrument. This provision does not apply to changing the name of a subdivision, which requires a material amendment described in the following provisions.

C.

Material Subdivision Amendments: A fee owner of land in a platted subdivision may request a material subdivision amendment by filing a written petition with the Planning Commission. This petition must meet all the requirements for a subdivision application specified in Section 11-4-2, with the following changes:

1.

The plat (or the record of survey map, if applicable) should:

a.

Depict only the portion of the subdivision that is proposed to be amended;

b.

Include a plat name distinguishing the amended plat from the original plat;

c.

Describe the differences between the amended plat and the original plat;

d.

Include references to the original plat; and

e.

Meet all the other plat requirements specified in Section 11-4-2.

2.

The petition must additionally include the name and address of each property owner affected by the petition and the signature of each of those property owners who consents to the petition.

a.

The petitioner must include with the petition envelopes addresses to each property in the subdivision.

3.

Upon receipt of an amendment petition, the Planning Commission, or Zoning Administrator, shall provide notice of the petition to:

a.

Each utility provider that services a parcel of the subdivision. The Land Use Authority shall not approve an amendment petition until at least 10 calendar days after notifying these utility providers. The designated Zoning Administrator may notify the utility providers in any effective manner (email, mail, etc.).

b.

Each property owner in the subdivision. The Planning Commission or Zoning Administrator shall notify these property owners by mail.

4.

The Planning Commission shall hold a public hearing before approving an amendment petition and within 45 calendar days after the day on which the petition is submitted if:

a.

A property owner objects in writing to the amendment within 10 days of the City notifying the property owner by mail, or

b.

Not every property owner in the subdivision has signed the revised plat.

5.

Notwithstanding Section 11-4-8 C 4 the Planning Commission need not hold a public hearing if notice has been given to adjoining property owners in accordance with any applicable local ordinance and the petition seeks to:

a.

Join two or more of the petitioner's contiguous lots;

b.

Subdivide one or more of the petitioner's lots;

c.

Adjust the lot lines of adjoining lots or between a lot and an adjoining parcel if the fee owners of each of the adjoining properties join in the petition, regardless of whether the properties are located in the same subdivision;

d.

On a lot owned by the petitioner, adjust an internal lot restriction imposed by the local political subdivision; or

e.

Alter the plat in a manner that does not change existing boundaries or other attributes of lots within the subdivision that are not owned by the petitioner or designated as a common area.

6.

If the Planning Commission approves the amendment petition, the Planning Commission shall sign the amended plat in the manner described in Section 11-4-5, and the City shall record the plat, subject to the completion or guarantee of any improvements, as described in Chapter 5 of this Title.

(Adopted by Ord. 2025-01 on 6/19/2025)

11-4-10: - Lot line#

adjustments

A.

The fee owners of two parcels may petition to adjust the lot line, or boundary separating the parcels without a subdivision amendment. Such a petition shall include:

1.

A record of survey map and a metes-and-bounds description showing the adjustment.

2.

An explanation of the reason for the adjustment.

3.

Signatures from all the parcel owners involved in the adjustment.

4.

Any other information the DRC requests.

B.

If the adjustment will not result in a violation of a land use ordinance or an adverse development condition, the DRC shall approve the petition.

C.

If the adjustment is approved, the DRC shall sign the record of survey map and accompanying metes-and-bounds description, and the City shall record the document in the County Recorder's Office.

(Adopted by Ord. 2025-01 on 6/19/2025)

11-4-11: - Flag lot subdivisions#

A.

General:

1.

Purpose: Flag lot subdivisions for single-family dwellings located in an agricultural or Rural Residential zone east of Hwy 38 may be allowed to accommodate the development of land that otherwise cannot reasonably be developed under the regulations contained in this title or other titles adopted by the city. The primary purpose of allowing flag lots is not to make development of land easier and more profitable, but rather, allowance of flag lots is intended to serve as a "last resort" for land which may not otherwise be reasonably subdivided under ordinary lot development standards.

2.

Intention: It is the intention of the City, when considering subdivisions with flag lots, to consider the future conversion of the staff portions of flag lots to a public road, specifically contiguous staffs.

3.

General Configuration: A flag lot shall be comprised of a staff (narrow) portion that is contiguous with a flag (wide) portion. See Exhibit A for more information.

B.

Land Use Authority: The following table outlines the Land Use Authorities:

Type of Application Reviewing Body Recommending Body Land Use Authority Appeal Authority

Preliminary Flag Lot Subdivision Development Review Committee Planning Commission City Council Hearing Officer

Final Flag Lot Subdivision Development Review Committee Planning Commission City Council Hearing Officer

C.

Subdivision Application Process and Requirements:

1.

The Flag Lot Subdivision Application Process and Requirements shall be the same as that described in Title 11, Chapter 4-2.

2.

A Flag Lot Subdivision application shall be considered a special subdivision application in which the City Council may set conditions for approval as found in this chapter.

D.

Conditions to Be Considered: When land is subdivided, flag lots shall not be approved by right but may be allowed after considering the following:

1.

More than two (2) flag lots with contiguous staffs shall not be approved. See Exhibit A for more information.

2.

Whether development of the property in question under otherwise applicable provisions of this title is reasonable and practical.

3.

Creation of a flag lot shall not foreclose the possibility of future development of large adjacent interior lots unless a street can be extended to such lots from other property.

E.

Findings Required: Flag lots shall be prohibited unless all the following findings are made:

1.

Flag lots shall be created only from a legally created lot of record which abuts State Highway 38.

2.

The flag portion of the flag lot shall be entirely located in an agricultural or Rural Residential zone; the flag portion shall not be split-zoned.

3.

The developer provides written and illustrative evidence showing property development with and without proposed flag lots which demonstrates:

a.

The design of the flag lot(s) is compatible with the design of the overall subdivision and adjacent property(ies).

b.

No other viable subdivision design alternatives exist that will allow for a conventional lot, including consideration of:

i.

The current, proposed, or alternative zoning;

ii.

The possibility of incorporating the subject property with adjacent property to achieve a more unified development of the area and eliminate the need for a flag lot;

iii.

Alternative street designs and improvements; and

iv.

Any other reasonable means that would render a flag lot unnecessary.

c.

Access to the flag lot is provided through the staff portion of the lot.

d.

The viability of future expansion and extension of the staff into a future public street right of way.

F.

Development Standards:

1.

Flag lot subdivisions shall contain no more than two (2) lots.

2.

The staff portion of a flag lot shall:

a.

Front on and be contiguous to State Highway 38 right of way;

b.

Be straight with a uniform width of thirty (30) feet, minimum, or if contiguous with an existing staff, be of such width to make a combined total uniform width of sixty (60) feet;

c.

Be used only for ingress/egress with no structures or buildings erected within the staff portion; and

d.

Be improved with a hard surface such as concrete, asphalt, or compacted road base with an approved dust prevention treatment, capable of meeting fire code requirements.

3.

The flag portion of a flag lot shall:

a.

Conform to the minimum lot size requirement of the zone where the flag portion is located; and

b.

Contain sufficient turnaround space for emergency vehicles near the buildable area on the lot, sufficient to meet fire code requirements.

4.

The front yard of a flag lot shall be on the side of the flag portion which connects to the staff. Yard setbacks shall conform to the setback requirements of the zone in which the flag portion of the flag lot is located.

5.

Fire Protection: A main building shall be located not more than 300 feet from a fire hydrant, as measured along the highway right of way and/or along the staff portion of a flag lot.

a.

When the distance exceeds 300 feet, the developer, at his own expense, shall install water line and a fire hydrant as needed to obtain required fire flow and pressure. City Engineer shall determine required size of water line. Water line and fire hydrant(s) shall become the property of the City upon final acceptance of the improvements.

b.

Developer shall dedicate to the City a twenty (20) foot wide easement for any water line and/or fire hydrant located on private property for access to and maintenance of the water line and/or fire hydrant.

6.

Clear address signage shall be installed and maintained at the intersection of the staff and State Highway 38 by the owner, including notice that the driveway is a private right of way.

7.

All improvements in a flag lot subdivision, including installation of the hard surface and fire hydrants, shall be provided at the subdivider's expense. No building permits shall be issued for a proposed flag lot until improvements are fully installed. Required improvements and applicable conditions of approval for a flag lot subdivision shall be constructed and bonded pursuant to Title 11 Chapter 5.

8.

Developer shall submit proof of an approved Conditional Access Permit granted by the Utah Department of Transportation with final flag lot subdivision application.

9.

See Exhibit A for more information.

G.

In addition to the above Development Standards, the City Council may, as part of a preliminary or final flag lot subdivision approval, impose additional conditions on a flag lot including, but not limited to, the following:

1.

Fencing and screening requirements.

2.

Location and height of the dwelling.

3.

Additional off-street parking and/or backup space designed in accordance with standards set forth in chapter 19 of this title.

4.

Upon review, the city may require installation of curb, gutter, and other drainage control measures in the staff portion of a flag lot to prevent runoff from entering neighboring properties.

(Adopted by Ord. 2026-07, Exh. A, on 6/3/2026)

CHAPTER 5: - SUBDIVISION IMPROVEMENTS#

11-5-1: - Improvements required#

A.

Compliance: The Land Use Authority shall not approve a preliminary subdivision application if the related improvement plan does not comply with City ordinances and standards, rules, and regulations for subdivisions and development approved by the City Council.

B.

Guarantee: No final plat of a subdivision of land shall be recorded unless the developer furnishes to the City a guarantee in an amount equal to 110% of the reasonable cost of the improvements required by this Chapter. The amount of the guarantee shall be estimated by the developer's Engineer and approved by the Land Use Authority and conditioned upon payment by the developer of all expenses incurred and for all labor or material used in the construction of required improvements. The provisions of the guarantee shall be for the protection of laborers and material providers and to guarantee the quality, quantity, and performance of all improvements as required herein. In no event shall the City be deemed liable under this Chapter on any claim asserted by a laborer or material provider.

(Adopted by Ord. 2025-01 on 6/19/2025)

11-5-2: - Essential facilities#

The developer of any land shall install or guarantee the installation of the following essential facilities as needed to serve a development in compliance with applicable construction standards:

A.

Culinary Water Facilities:

1.

Each new development and subdivision shall connect to the Honeyville City Culinary Water System. Extensions or improvements of the existing culinary water system may be required of the developer to facilitate serving the new subdivision or development with culinary water.

B.

Irrigation Water Facilities:

1.

For new development east of the Hammond East Canal requiring three (3) or less new culinary water connections or west of the Hammond East Canal requiring not more than one (1) new culinary water connection, developer shall:

a.

Utilize the culinary water system for irrigation water for a maximum of 10,000 sf of outdoor landscaping or gardening per lot, or

b.

Provide irrigation water facilities for outdoor use to all lots; proof of water shares or water rights is required.

2.

For new development east of the Hammond East Canal requiring more than three (3) new culinary water connections or west of the Hammond East Canal requiring more than one (1) new culinary water connection, developer shall provide irrigation water facilities for outdoor use to all lots. Proof of water shares or water rights is required.

C.

Secondary Water Facilities:

1.

The developer shall install secondary water mains, valves, and laterals in all new road rights-of-way.

D.

Sewage Disposal:

1.

Developers shall provide a letter of septic suitability from the Health Department.

E.

Stormwater Drainage:

1.

All new development shall convey and control its stormwater. Developer shall install all required stormwater conveyance and detention facilities.

2.

Developer shall demonstrate that the receiving stormwater conveyance is capable of accepting the discharge.

F.

Road Improvements:

1.

Unless otherwise permitted by an express provision of this Title, each road to be constructed and dedicated to the City shall be in accordance with the Master Street Plan and shall meet the City Standards.

2.

A developer of a subdivision which abuts a substandard street shall, for the half-width of the street abutting the subdivision boundary:

a.

Dedicate additional right-of-way as necessary to meet the street width standards, and

b.

Improve the street infrastructure to meet current City Standards, regardless of whether a dedication occurs.

G.

Fire Protection: Fire hydrants shall be placed within 500 feet of one another throughout a subdivision and installed accordingly as required by applicable building and fire codes.

H.

Utility Services: A developer shall be responsible for securing service agreements with local electrical, telecommunications, and natural gas providers, as applicable, and shall be financially responsible for any associated costs to extend such utilities to a development.

I.

Street Signs: The contractor will furnish and install all necessary street signs at required locations and in conformance with City Standards.

(Adopted by Ord. 2025-01 on 6/19/2025)

11-5-3: - Order of making improvements#

A.

Compliance With Construction Standards: The improvements required in this Title shall be installed in compliance with applicable construction standards. No improvements shall be installed until their location and specifications are approved by the City.

B.

Underground Installations: Unless waived in writing by the Land Use Authority, all underground utilities, water, sewer, and gas laterals, and fire hydrants shall be installed prior to road base, curbs, gutters, sidewalks, and surfacing the streets.

(Adopted by Ord. 2025-01 on 6/19/2025)

11-5-4: - Improvements completion#

Installation of improvements shall be completed within one (1) year of the date of approval of the final plat by the City. The Land Use Authority may, for good cause, extend this completion time requirement for no more than one (1) additional year, provided that the completion assurance required to be filed with the City, as set forth below, is extended for the same one (1) year period.

(Adopted by Ord. 2025-01 on 6/19/2025)

11-5-5: - Phased development; improvements continuous, orderly#

Whenever a developer develops a subdivision one phase at a time, such development shall be completed in an orderly manner and in such a way that the required improvements will be continuous and all of the said improvements will be made available for the full, effective, and practical use and enjoyment thereof by the purchasers, lessees, grantees, assignees or transferees of any of the lands subdivided within the time hereinbefore specified or within the phases specified.

(Adopted by Ord. 2025-01 on 6/19/2025)

11-5-6: - Cost distribution#

Every developer shall pay a roughly proportionate share of any on or off-site improvements necessary to serve a development, as reasonably determined by the City Engineer.

(Adopted by Ord. 2025-01 on 6/19/2025)

11-5-7: - Oversized facilities#

When it is determined by the Land Use Authority that specifications for subdivision improvements are not adequate to meet the demands above and beyond the demands within the subdivision and it is necessary for said improvements to serve intervening or other properties, the developer will be required to install "oversized" facilities. Reimbursement for costs shall be handled through a cost-sharing agreement with the developer and/or the property owners who benefit from the improvements.

(Adopted by Ord. 2025-01 on 6/19/2025)

11-5-8: - Cost-sharing agreement#

A.

Conditions: Whenever any intervening property is located between the terminus of an existing service facility and the proposed subdivision, and the intervening property will be benefited by the installation of any of the required facilities, the developer shall pay for having all facilities, not installed by a utility company, constructed over, under and/or across the intervening property. If approved by the City Council, before approval of a final plat and prior to any construction, the developer may enter into an agreement with the City for a partial cost reimbursement, otherwise, agreements shall be made with intervening property owners.

B.

Actual Construction Costs; Determination: The cost of the facilities to be included in a cost-sharing agreement shall be the actual construction cost as determined by competitive bids and shall include all costs for having the facilities installed, including legal, administrative, and engineering costs.

C.

Proportionate Share Stated: The agreement shall state the proportionate share of the costs to be borne by the developer and the proportionate share to be reimbursed to the developer from fees collected from the intervening property owners.

D.

Deferred Credit: The City shall thereafter enter a deferred credit in its books and records and shall charge the benefited property owners the fee rates for sewer, water, and electrical connections in effect at the time such connections are made. Such fees, not to exceed the maximum stated in the agreement, shall then be returned to the developer to reimburse the developer for the proportionate share of the costs of the installation of the facilities. The City may also elect to reimburse the developer for such "off-site" facilities after the developer has furnished the City with acceptable evidence that an agreed number of housing units are occupied. No interest shall accrue or become payable on such reimbursement. engineering drawings showing benefited property shall be prepared by the developer's engineer.

(Adopted by Ord. 2025-01 on 6/19/2025)

11-5-9: - Inspection#

A.

Inspections: All construction work involving the installation of improvements in subdivisions shall be subject to inspection by the City. The Land Use Authority or other authorized representative of the City shall make inspections.

1.

Arrangement for inspection must be made with the Land Use Authority at least three (3) days prior to beginning construction of the improvements.

B.

Inspection and Testing by City: In order to assure the City that the intent of the construction standards and this Title are being complied with, the City shall provide inspection and testing services at the expense of the developer. Payment for these services will be made by the developer.

C.

City Engineer Represents City: The City Engineer shall act as the City's representative during the construction period and shall:

1.

Decide questions which may arise as to quality and acceptability of materials furnished and work performed.

2.

Interpret the intent of construction standards in a fair and unbiased manner.

3.

Make periodic visits to the site and determine if the work is proceeding in accordance with the provisions of this Title.

D.

Responsibility:

1.

Each developer shall be solely responsible for complying with applicable construction standards and the provisions of this Title in regard to the quality of materials, workmanship, and execution of the work.

2.

The City Engineer shall not be responsible for the construction means, controls, techniques, sequences, procedures, or construction safety.

E.

Performance Obligation of Developer: Inspections, tests, or approvals by the Land Use Authority or other agent representing the City shall not relieve the developer from his obligation to perform the work in accordance with the requirements of the construction standards and this Title.

(Adopted by Ord. 2025-01 on 6/19/2025)

11-5-10: - Improvement guarantee#

A.

Improvement Guarantee Required: Developer shall execute a written improvement agreement, recorded in the Office of the City Clerk, where developer agrees that the subdivided property will not be leased or conveyed to any person unless all required improvements are installed or in lieu of installation, the developer furnishes the City, when the final plat is approved, one of the following guarantees, approved by the City Council, that improvements, not then installed, will be constructed and paid for within a period of one (1) year from the date of subdivision approval:

1.

A bond with a corporate surety in an amount equal to 110% of the cost of the improvements.

2.

A deposit in escrow with an escrow holder in an amount of money equal to 110% of the cost of the improvements.

3.

An irrevocable letter of credit from a financial institution is filed with the City which contains provisions substantially similar to those required in the escrow agreement.

B.

If a developer installs any or all required improvements prior to final plat approval, the developer shall furnish the City one (1) of the three (3) guarantees listed in paragraph A at the time the final plat is approved, in an amount equal to ten percent (10%) of the cost of the improvements as a guarantee that the improvements, as installed, shall remain free from defects and shall be maintained by the developer until final acceptance by the City Council.

C.

Covenant Running With Land: The improvement agreement shall specifically provide that it shall be deemed to be a covenant running with the subdivided land for the benefit of the City and shall particularly and accurately describe said land.

D.

Approval By City Attorney: The improvement agreement shall be approved as to form by the City Attorney.

E.

Scope Of Agreement: An improvement agreement shall be restricted to guaranteeing installation of applicable improvements and shall be separate from any developer financing or funding program.

F.

Funds Release: Funds may be released or the amount of the bond or letter of credit decreased only upon recommendation by the Land Use Authority.

(Adopted by Ord. 2025-01 on 6/19/2025)

11-5-11: - Partial release of funds#

A.

Authority: At the request of a developer the City may release from the improvement guarantee the estimated costs of improvements installed by the developer and approved by the Land Use Authority.

B.

Process For Partial Release:

1.

The developer shall submit to the Land Use Authority an application for release, signed by the developer, which details the work completed as of the date of the application.

2.

The City Engineer shall review the release request, verify the requested quantities have been installed or constructed in accordance with City Standards, and, if in concurrence, prepare and submit to the City an approved release request.

3.

The City Engineer's approval of a requested release shall constitute a representation to the City that the subject improvements have been completed, to the best of the Engineer's knowledge, information, and belief, in accordance with applicable construction standards. However, by approving any such payment, the City Engineer shall not be deemed to have represented that the Engineer:

a.

Made exhaustive or continuous on site inspections,

b.

Checked the quality or quantity of the work,

c.

Reviewed the means, methods, techniques, sequences and procedures of construction, or

d.

Made any examination to ascertain how or for what purpose the developer has used the monies released.

4.

The City shall then release the amount approved by the City Engineer.

C.

A developer shall not obtain a release from the bonds, withdraw from the covenant, and lien improvements guarantee any amount in excess of 100% of the estimated cost of the improvements, but shall pay from other sources any costs for such improvements which exceed 100% of the costs approved by the City Engineer.

(Adopted by Ord. 2025-01 on 6/19/2025)

11-5-12: - Conditional acceptance#

A.

Request: After all required improvements are complete, each developer shall, in writing, notify the Zoning Administrator and the Land Use Authority that improvements are complete and shall request conditional acceptance by the City.

B.

Inspection: The City Engineer shall then inspect and notify the developer in writing of any work that is defective. The developer shall immediately remedy such defects.

C.

Construction Drawings: After all required improvements have been satisfactorily installed and approved by the Land Use Authority, and as a requirement of "conditional acceptance," the developer shall furnish a Mylar or Mylar copy of all original construction drawings. These drawings shall show the "as constructed" condition of all improvements.

D.

Notice Of Acceptance: The City Engineer shall, as soon as improvements are acceptable and after receipt of the as-built drawings, present to the developer a notice of conditional acceptance establishing the date for beginning the one (1) year guarantee period.

(Adopted by Ord. 2025-01 on 6/19/2025)

11-5-13: - Warranty of work#

Developer shall warrant and guarantee for a period of one (1) year from the date of the City's conditional acceptance that all improvements are free from defects due to faulty materials or workmanship. Each improvement guarantee shall remain in effect until the developer receives final written acceptance from the City at the conclusion of the guarantee period.

A.

Repairs: Developer shall, at no cost to the City, promptly make such corrections as may be necessary by reason of any improvement defects, including repair of damage to other improvements resulting from such defects. The City shall give notice of observed defects with reasonable promptness. In the event the developer fails to make such repairs, adjustments, or other work that may be necessary due to such defects, the City may perform the developer's obligations and charge the developer the cost thereby incurred.

B.

City Engineer Determination: The City Engineer shall determine the necessity for repairs of improvements whose decision shall be final and binding upon the developer.

C.

Completion Of Repairs: Whenever, in the judgment of the City Engineer, improvements shall be in need of repair, the Engineer shall cause written notice to be served on the developer. Thereafter the developer shall promptly complete such repairs.

(Adopted by Ord. 2025-01 on 6/19/2025)

11-5-14: - Final acceptance and release#

A.

Request: Developer shall be responsible for making a written request to the Zoning Administrator and the City Engineer for final acceptance and release. The City Engineer shall then inspect the subdivision improvements. If defects exist, the Land Use Authority shall notify the developer, in writing, who shall promptly replace and/or repair all defective work.

B.

Notification: When the improvements are acceptable, the City Engineer shall notify the City Council, in writing, which shall then issue a letter of final acceptance and release the 10% warranty.

(Adopted by Ord. 2025-01 on 6/19/2025)

11-5-15: - Acceptance period#

Requests for conditional and final acceptance shall be made during periods when all improvements can be visually inspected by the City Engineer. Any improvements buried with soil or snow or otherwise not visible shall not be approved. Generally, no acceptances will be made from November through and including February.

(Adopted by Ord. 2025-01 on 6/19/2025)

CHAPTER 6: - SUBDIVISION CONSTRUCTION, DRAWING AND DESIGN STANDARDS#

11-6-1: - General provisions#

A.

Intent: It is the intent of these construction standards to describe the minimum acceptable requirements necessary to complete the improvements required by the City. Any work or improvements that may be reasonably inferred from these standards, as being required to produce the intended result, shall be supplied whether or not it is specifically called for. Work, materials, or equipment described in words which so applied have a well-known technical or trade meaning shall be deemed to refer to such recognized standards. Details and specifications for public works construction shall conform to the latest version of the American Public Works Association manual of standard specifications (published by the T2 Center at Utah State University and further referenced throughout this chapter as APWA specifications) and the Honeyville City Public Works Construction Standards.

B.

Contracts And Subcontracts:

1.

Prior to construction, the developer will submit to the City and the City Engineer for approval, a list of the names of all contractors and/or subcontractors the developer proposes to employ in constructing the improvements required herein.

2.

The developer will not employ any contractor or subcontractor (whether initially or as a substitute) against whom the City or the City Engineer may have reasonable objection, nor will the developer be required to employ any contractor or subcontractor against whom he has reasonable objection.

3.

The developer will be fully responsible for all acts and omissions of his contractors and subcontractors and of persons directly or indirectly employed by him.

C.

Nothing in the contract documents shall create any contractual relationship between any contractor or subcontractor and the City or the City Engineer, or any obligations on the part of the City or the City Engineer, to pay or to see to the payment of any monies due any contractor or subcontractor, except as may otherwise be required by law.

D.

The developer shall agree to specifically bind every contractor and subcontractor to all of the applicable terms and conditions of the construction standards. Every contractor or subcontractor, by undertaking to perform any of the work, will thereby automatically be deemed to be bound by such terms and conditions.

(Adopted by Ord. 2025-01 on 6/19/2025)

11-6-2: - Design standards#

A.

Streets:

1.

The arrangement of streets in new subdivisions shall make provision for the continuation of the existing streets in adjoining areas and shall provide access to unsubdivided adjoining areas insofar as such continuation or access shall be deemed necessary by the Approval Authority. New streets shall connect to existing public streets.

2.

The street arrangement should be such as to cause no unnecessary hardship to owners of adjoining property when they plat their own land and seek to provide for convenient access to it. If the adjoining land is zoned for residential use, streets shall be located so that the adjacent land may be most efficiently subdivided.

3.

Half streets, consisting of half of a standard road right of way width or half of a fully developed street, on the boundary of a subdivision, are prohibited.

4.

Sharing of road development costs with abutting property owners and recovery of the same is provided for with a protection strip as described in Section 10-22-15 of the Land Use Title.

5.

Conform To Master Street Plan: Streets shall conform to the adopted Master Street Plan.

6.

Road Right-of-Way Widths: Major and collector streets shall conform to the width designated on the Master Street Plan wherever a subdivision is in an area for which a Master Street Plan has been adopted. For territory where such street plan has not been completed at the time the preliminary subdivision application is submitted to the City, streets shall be provided as required by the Approval Authority. All streets serving permanent cul-de-sacs (permanent dead-end streets) are considered to be minor streets and shall have the same width of that specified for a minor street.

7.

Urban and Rural Street Designation:

a.

Urban Streets: Streets within zones having a density of one-half (½) acre or less shall be considered urban streets and shall include curb, gutter, and sidewalk. Installation of sidewalks, handicap ramps, and curbs and gutters is required on existing urban streets bordering a new subdivision.

b.

Rural Streets: Streets within zones having a density greater than one-half (½) acre shall be considered rural streets.

8.

Design and Construction: All streets shall conform to the Honeyville City Design and Construction Standards.

9.

Cul-De-Sacs:

a.

Cul-de-sacs shall not exceed 650 feet measured from centerline intercept of the nearest three-way "tee" or four-way "cross" intersection to the center point of the circular turnaround.

b.

Cul-de-sacs shall not serve more than ten (10) lots (including the corner lots fronting on the stem road to the cul-de-sac.

c.

Cul-de-sacs may be used only where such conditions exist which make other road designs undesirable, infeasible, or impose an unusual hardship. Every effort shall first be made to configure a new road system to avoid cul-de-sacs prior to submitting a proposed road system design.

d.

Each cul-de-sac shall conform to the Honeyville City Design and Construction Standards.

10.

Temporary Turnaround:

a.

A temporary turnaround shall be used where a street is temporarily terminated and is more than one lot deep on both sides of the street.

b.

Each temporary turnaround shall conform to the Honeyville City Design and Construction Standards.

11.

Road Obstructions and Termination: In the event that any road or street in any subdivision shall terminate at or within a distance equal to the average required lot frontage of the subdivision of any ditch, canal, creek, waterway, or other obstruction which will, in the opinion of the City Engineer, require a bridge or other structure in order to continue the road over or across the canal, ditch, creek, waterway or other obstruction, the developer shall deposit with the City a sum of money equal to one-half (1/2) of the City Engineer's estimate of the cost for constructing a proper and suitable bridge over the same. The City Engineer shall, on request, furnish the developer a cost breakdown for any such structure. At such time, in the opinion of the City Council, as it becomes desirable to construct such structure, the same shall be constructed by the City applying such deposit toward the construction costs and charging the other one-half (1/2) of such cost to the person developing the other side, or if there is no person so developing the other side, the half shall be borne as a City expense.

12.

Frontage on Major Highway:

a.

Where a subdivision abuts a major highway, frontage roads may be required by the Utah Department of Transportation (UDOT).

b.

All development and subdivisions fronting on a UDOT highway require UDOT approval of driveway and access points and any street intersection with a UDOT highway.

c.

Sidewalk along SR 38 shall be provided:

I.

Along the west right-of-way for development north of 7200 N, and

II.

Along the east right-of-way for development south of 6900 N.

13.

Monuments: Permanent monuments shall be accurately set and established at such points as are necessary to definitively establish all lines of a subdivision plat, except those outlining individual lots. Monuments shall be of a type approved by the Land Use Authority. All subdivision plats shall be tied to a section corner, a monument of record, or an established land office survey corner.

14.

Street Names: A street shall have the name and address grid designation of the street which exists along the same alignment. Each street with a name shall also be assigned a grid address assigned to the street in conformance with the predominant Box Elder County street address grid system. A street name existing within the City or within a community which abuts Honeyville City shall not be duplicated.

B.

Easement Standards:

1.

Front lot line public utility easements are required and shall be a minimum of ten feet (10') wide and shall be dedicated as public utility easements unless the City Engineer determines a particular easement is unnecessary.

2.

Easements shall be provided for all utilities located on private property.

3.

Easements for pressurized waterlines shall be a minimum of 20 feet in width and shall be dedicated to the owner of such waterline.

4.

Easements for irrigation water facilities shall be a minimum of 10 feet in width and shall be dedicated to the users of said facilities.

5.

Easements for drainage facilities shall be a minimum of 10 feet in width and shall be dedicated to the owner of said facilities.

6.

Whenever any stream or important surface drainage course is located in an area that is being subdivided, the developer shall dedicate to the City an adequate easement along each side of the stream for the purpose of widening, deepening, sloping, improving or protecting the stream.

C.

Utilities To Be Underground:

1.

Unless the Approval Authority determines, upon application by the developer, supported by recommendation of the City Engineer, that it is not feasible to do so, all new power lines, telephone lines, and other normally overhead utility lines shall be placed underground by the developer.

D.

Blocks:

1.

Blocks shall not exceed 1,300 feet in length. Blocks over 800 feet in length shall be provided with a walkway dedicated to the City through the block at its approximate center. Such walkways shall be not less than ten feet (10') in width. The width of blocks generally shall be sufficient to allow two (2) tiers of lots. Blocks intended for business or industrial uses shall be designed specifically for such purposes with adequate space set aside for off-street parking and delivery facilities.

2.

Property lines at all street intersections shall be rounded with curves having a minimum radius of fifteen feet (15').

E.

Lots:

1.

The lot arrangement and design shall be such that lots will provide satisfactory and desirable sites for buildings and be properly related to topography and to existing and probable future requirements.

2.

All lots shown on the subdivision plan shall conform to the minimum requirements of the zone in which the subdivision is located, and to the minimum requirements for sewage disposal.

3.

Each lot shall abut on a street dedicated by the recording of a subdivision or on an existing publicly dedicated street.

4.

Double frontage lots are prohibited unless approved by the Approval Authority for reasons of topography or other agency restrictions.

5.

No wedge-shaped lot shall be less than thirty feet (30') in width at the front property lines, or less than the lot frontage at the front setback line required in the Zoning District, whichever is larger.

6.

Side lot lines shall be at right angles or radial to street lines for the full depth of the lot except where exceptional topography exists and approved by the Approval Authority.

7.

Corner lots shall have the minimum required frontage on both streets.

8.

All remnants below the minimum lot size leftover after subdividing a larger tract shall be added to adjacent lots, rather than allowed to remain as unusable parcels.

9.

No single lot shall be divided by a City or county boundary line.

10.

A lot shall not be divided by a road, alley, or other lots or property.

F.

Storm Drainage and Floodplains:

1.

Complete drainage systems for the entire subdivision area shall be provided. The storm drainage system for the subdivision shall meet the requirements of Honeyville City Design and Construction Standards.

2.

If the final plat is to be presented in phases, a general drainage plan for the entire area shall be provided with the preliminary plat, and appropriate development stages for the drainage system for each section indicated.

3.

Any subdivision containing floodplains or flood-prone areas shall be subject to Title 12 of this Code.

G.

On-Site Sewage Disposal:

1.

Whenever individual septic tanks are proposed as sanitary sewage disposal systems, the developer shall either install such facilities or include on the final subdivision plat a plat note requiring the on-lot sanitary sewage disposal facilities be installed by the owner as a condition of the principal building permit issuance.

H.

Culinary Water System:

1.

Each new development and subdivision shall connect to the Honeyville City Culinary Water System. Extensions or improvements of the existing culinary water system may be required of the developer to facilitate serving the new subdivision or development with culinary water.

2.

The culinary water system for the subdivision shall meet the requirements of Honeyville City Design and Construction Standards.

I.

Irrigation Water Facilities:

1.

Irrigation water facilities shall be provided in accordance with Section 11-5-2.

2.

Plans and specifications for the irrigation water system shall be approved in writing by the agency furnishing the water and the Land Use Authority.

3.

Where an existing irrigation system consisting of open ditches is located within or adjacent to a proposed subdivision, complete plans for relocation or covering and other safety precautions shall be submitted with an application for preliminary approval of a plat.

4.

The open ditches or canals shall not be allowed within or adjoining a subdivision, except when fenced along rear or side lot lines. The developer shall work with irrigation, drainage, or ditch companies regarding:

a.

Methods of covering, realigning, or eliminating ditches or canals within or adjoining the subdivision.

b.

The size of pipe and culverts required.

c.

The responsibility for the periodic inspection, cleaning, and maintenance of such ditches, pipes, and culverts. In cases where canals or ditches cross public roads or proposed public roads, specifications, and grades for pipe or culvert shall be approved by the Land Use Authority.

J.

Secondary Water Facilities: All new development shall be required to install secondary water lines within all new street rights-of-way as detailed in the Honeyville City Design and Construction Standards.

K.

Safety Fences: The developer shall install a six-foot (6'), non-climbable chain link fence, or its equivalent, along large open ditch, canal or waterway, non-access street, open reservoir, or body of water, railroad right-of-way, and other such features of potentially hazardous nature which cross or are contiguous to the property being subdivided or developed; provided, however, that any feature which the Approval Authority reasonably determines is not likely to present a hazard to life may be exempted from this requirement.

(Adopted by Ord. 2025-01 on 6/19/2025)