Skip to content
52

ARTICLE X. - APPLICATIONS

Part of the Code of Ordinances of Burnet, TX.

Local law · 1,620 sections

The text

Sec. 21-121. - Application process.#

(a)

Permit application. Application for permits shall contain or have attached thereto the following information:

(1)

Name, address, and telephone number of the applicant.

(2)

Location of the building, structure, or lot on which the sign is to be attached or erected.

(3)

Two sets of plans shall be submitted showing the sign location in relation to nearby buildings or structures, signs, property lines, driveways, public streets, fences, and sidewalks.

(4)

Two blueprints or ink drawings of the plans and specifications showing method of construction, attachment to the building or ground, size, type, height, construction materials, and such other materials, and such other information as the building official may require. The building official may require plans to be prepared by a registered professional engineer who is registered by the state or an architect licensed by the state.

(5)

Copy of stress sheets and calculations showing the structure as designed for dead load and wind pressure in any direction in the amount required by this chapter, and all other laws and codes of the city.

(6)

Name of person, firm, corporation, or association erecting structure.

(7)

Any electrical permit required and issued for said sign.

(8)

Zoning classification carried by the property.

(9)

Estimated value of the sign.

(10)

Such other information as the building official shall require showing full compliance with this chapter and all other laws and codes of the city.

(b)

Permit issuance. It shall be the duty of the building official, upon the filing of an application for a sign permit, to examine such plans and specifications and other data and the premises upon which it is proposed to erect a sign. If it appears that the proposed structure is in compliance with all the requirements of this chapter, the building code, and all other laws and ordinances of the city, the building official shall then issue the sign permit. If the work authorized under a sign permit has not been completed within 60 days after issuance, the said permit shall become null and void.

(Ord. No. 2021-04, § 1, 2-9-21)

Editor's note— Ord. No. 2021-04, § 1, adopted February 9, 2021, set out provisions intended for use as 21-111. To avoid the duplication of section numbers, and at the editor's discretion, these provisions have been included as 21-121.