Skip to content
52Nov 3 election

Sec. 17-111. - Location of connection.

Part of the Code of Ordinances of East Providence, RI.

Local law · 2,200 sections

The text

The connection of the building sewer into the public sewer shall be made at the curb fitting, if provided, or the "Y" branch, if such branch is available at a suitable location. Where no "Y" branch is available, a cut-in or tap shall be made by the sewer division. Such connection shall be made at the location specified by the director of public works.

(Rev. Ords. 1987, § 17-111)