6.19.100 - Compliance with construction and demolition waste management plan.

Part of the Code of Ordinances of Commerce, CA.

Local law · Updated May 13, 2025 · 2,277 sections

The text

Applicants shall demonstrate continuous compliance with all requirements of the C&D WMP for the duration of the project as follows: (1)

Prior to final sign off or final release of any covered project, the applicant shall submit to the environmental compliance official documentation that it has met the diversion requirement for the project. Applicant shall provide a final reporting of efforts used to meet the diversion requirement and also provide the following documentation:

(2)

Receipts from the vendor or facility which collected or received each material showing the actual weight or volume of that material:

(A)

Weight slips/count of material salvaged or reused in current project;

(B)

A copy of the previously approved C&D WMP for the project adding the actual volume or weight of each material diverted and transported for disposal in a landfill or transformation facility; and

(C)

Any additional information the applicant believes is relevant to determining its efforts to comply in good faith with this chapter.

(3)

Applicants shall make reasonable efforts to ensure that all C&D debris diverted or landfilled are measured and recorded using the most accurate method of measurement available. To the extent feasible, all C&D debris shall be weighed by measurement of scales. Such scales shall be in compliance with all state and county regulatory requirements of accuracy and maintenance. For C&D debris for which weighing is not practical due to small size or other considerations, a volumetric measurement shall be used. For conversion of volumetric measurements by weight, the applicant shall use the standardized conversion rates approved by the city for this purpose.

(Ord. No. 618, § 1, 1-6-2009)