Skip to content

Cases — 4339913

1 recorded connections shown. Select a record, office or person to follow its source references.

Start with
and connect to

Browse all held record sources

Zoom to read. Drag to explore. Select a connection.

Cases — 4339913

Cases · As of Oct 2, 2026

Cases — 4339913: 1 outgoing connections shown. Point at anyone to see how they are linked.Showing bounded source connections. Dates come from the held records; missing relationships remain unknown.

The source record

As of Oct 2, 2026.

Activity name
BORREGO SOLAR SYSTEMS INC / MASS MIDSTATE SOLAR
Case number
01-2015-2020
Case name
BORREGO SOLAR SYSTEMS INC / MASS MIDSTATE SOLAR
Region code
01
Fiscal year
2015
Activity type code
AFR
Activity type desc
Administrative - Formal
Activity status code
FOI
Activity status desc
Final Order Issued
Activity status date
2015-11-02
Lead agency
EPA
Case status date
2015-11-02
Enforcement outcome code
ECP
Enforcement outcome desc
Final Order With Penalty
Voluntary self disclosure
false
Multimedia flag
false
Summary text
On November 2, 2015, Region 1 filed a consent agreement and final order (CAFO) settling an administrative penalty complaint under the Clean Water Act against Borrego Solar Systems, Inc. (Borrego). Borrego failed to comply with several provisions of the NPDES General Permit for Stormwater Discharges from Construction Activities during the construction of three solar panel arrays in Warren, Massachusetts in 2013-2014. Specifically, Borrego failed to install specified stormwater detention basins before earth-disturbing activities were begun, failed to construct stormwater detention basins to design specifications, and failed to install and maintain fabric filters to prevent erosion off the perimeter of the site. Approximately 10-35 cubic yards of sediments were discharged into nearby brooks and wetlands as a result of these failures. The CAFO calls for Borrego to pay a $ 90,000 penalty.
Created at
2026-10-02T02:02:59.061315+00:00
Updated at
2026-10-02T02:02:59.061315+00:00