Cases — 4309878

Cases · As of Oct 2, 2026

Cases — 4309878: 1 outgoing connections shown. Point at anyone to see how they are linked.Showing bounded source connections. Dates come from the held records; missing relationships remain unknown.

The source record

As of Oct 2, 2026.

Activity name
Atlantis Oil Company (L. A. Chandler Lease)
Case number
06-2005-4357
Case name
Atlantis Oil Company (L. A. Chandler Lease)
Region code
06
Fiscal year
2005
Activity type code
AFR
Activity type desc
Administrative - Formal
Activity status code
CLS
Activity status desc
Closed
Activity status date
2005-07-27
Lead agency
EPA
Case status date
2005-07-27
Enforcement outcome code
ECP
Enforcement outcome desc
Final Order With Penalty
Branch
6SF-R
Voluntary self disclosure
false
Multimedia flag
false
Summary text
Summary of Findings: Plan has inadequate or no facility diagram. Plan does not discuss and/or facility does not implement appropriate containment/diversionary structures/equipment (including truck transfer areas). No training on the operation and maintenance of equipment to prevent discharge. No training on discharge procedure protocols. No training on the applicable pollution control laws, rules and regulations. No training on the contents of the SPCC Plan. Spill prevention briefings are not scheduled and conducted periodically. Visual inspections of containers, foundation and support are not conducted periodically for deterioration and maintenance needs. Above ground valves and pipelines are not examined periodically on a scheduled basis for general condition (includes items, such as: flange joints, vlave glands 2nd bodies, drip pans, pipeline supports, bleeder and guage valves, polish rods/stuffing box.) Inadequate or no flowline maintenance program (includes: examination, corrosion protection, flowline replacement.)