Cases — 4304932
1 recorded connections shown. Select a record, office or person to follow its source references.
Start with
and connect to
Browse all held record sources
Zoom to read. Drag to explore. Select a connection.
Cases — 4304932
Cases · As of Oct 2, 2026
The source record
As of Oct 2, 2026.
- Activity name
- WEYERHAEUSER COMPANY, A WASHINGTON CORPORATION
- Case number
- 06-2000-0395
- Case name
- WEYERHAEUSER COMPANY, A WASHINGTON CORPORATION
- Region code
- 06
- Fiscal year
- 2000
- Activity type code
- AFR
- Activity type desc
- Administrative - Formal
- Activity status code
- CLS
- Activity status desc
- Closed
- Activity status date
- 2001-02-05
- Lead agency
- EPA
- Case status date
- 2001-02-05
- Enforcement outcome code
- ECP
- Enforcement outcome desc
- Final Order With Penalty
- Total penalty assessed
- 40000.0
- Hq division
- AIR
- Branch
- 6RC-E
- Voluntary self disclosure
- false
- Multimedia flag
- false
- Summary text
- 1. SECTION 113(D) OF THE CLEAN AIR ACT ( CAA ), 42 U.S.C. SECTION 7413(D). 2. WEYERHAEUSER COMPANY, MOUNTAIN PINE MILL STATE HIGHWAY 227 MOUNTAIN PINE, GARLAND COUNTY, ARKANSAS 71956 3. RESPONDENT WAS IN VIOLATION OF TITLE V OF THE CAA BY: 1) RESPONDENT OPERATED THE VENTURI SCRUBBER FOR THE ERIE CITY BOILER AT A RATE BELOW THE REQUIRED MINIMUM PRESSURE DROP RANGE OF 8 OF WATER DURING THE MONTHS OF APR. AND SEPT. 1999; 2) RESPONDENT OPERATED THE VENTURI SCRUBBER FOR THE ERIE CITY BOILER AT A RATE ABOVE THE MAXIMUM PRESSURE DROP RANGE OF 12 OF WATER DURING THE MONTHS OF MAY AND DEC. 1999; 3) RESPONDENT OPERATED THE VENTURI SCRUBBER FOR THE ERIC CITY BOILER AT A FLOW RATE BELOW THE MINIMUM OPERATING FLOW RATE ALLOWED IN RESPONDENT'S TITLE V PERMIT; 4) RESPONDENT OPERATED THE VENTURI SCRUB- BER FOR THE ERIC CITY BOILER AT A FLOW RATE ABOVE THE MAXIMUM OPERATING FLOW RATE ALLOWED IN RESPONDENT'S TITLE V PERMIT; 5) RESPONDENT OPERATED THE VENTURI SCRUBBER FOR THE KEELER BOILER AT A PRESSURE RATE WHICH WAS BELOW THE MINIMUM PRESSURE RATE ALLOWED IN RESPONDENT'S TITLE V PERMIT; AND 6) RESPONDENT OPERATED THE VENTURI SCRUBBER FOR THE KEELER BOILER AT A PRESSURE RATE WHICH WAS ABOVE THE MAXIMUM PRESSURE RATE ALLOWED IN RESPONDENT'S TITLE V MIT. 4. RELIEF SOUGHT PURSUANT TO SECTION 113(D) OF THE CAA, EPA PROPOSED A CIVIL PENALTY OF $193,600 FOR THE VIOLATIONS CITED.
- Created at
- 2026-10-02T02:02:59.061315+00:00
- Updated at
- 2026-10-02T02:02:59.061315+00:00
Every link on this map
The same connections as a table, with the reason each one is here.
| Cases | What this connects to | Cases — 4304932 has a recorded connection to Cases. | None |