Skip to content

Cases — 4274251

1 recorded connections shown. Select a record, office or person to follow its source references.

Start with
and connect to

Browse all held record sources

Zoom to read. Drag to explore. Select a connection.

Cases — 4274251

Cases · As of Oct 2, 2026

Cases — 4274251: 1 outgoing connections shown. Point at anyone to see how they are linked.Showing bounded source connections. Dates come from the held records; missing relationships remain unknown.

The source record

As of Oct 2, 2026.

Activity name
BP/AMOCO CORPORATION (NOW PHILLIPS 66)-BELLE CHASE-CAA CONSENT DECREE-2005
Case number
06-2000-0879
Case name
BP/AMOCO CORPORATION (NOW PHILLIPS 66)-BELLE CHASE-CAA CONSENT DECREE-2005
Region code
06
Fiscal year
2000
Activity type code
JDC
Activity type desc
Judicial
Activity status code
FOE
Activity status desc
Final Order Entered
Activity status date
2005-12-05
Lead agency
EPA
Case status date
2005-12-05
Enforcement outcome code
ECP
Enforcement outcome desc
Final Order With Penalty
Hq division
AIR
Branch
6RC-E
Voluntary self disclosure
false
Multimedia flag
false
Summary text
CD Settled by ConocoPhiillips (CD originated when company was known as BP/Amoco) 1. SECTION 113 OF THE CLEAN AIR ACT (CAA), 42 U.S.C. SECTION 7413. 2. BP/AMOCO CORPORATION HIGHWAY 23 BELLE CHASSE. PLAQUEMINES PARISH, LOUISIANA 70037 3. RESPONDENT WAS IN VIOLATION OF SECTION 111 AND 112 OF THE CAA BY: 1) FAILURE TO PROPERLY MONITOR VALVES TO DETECT LEAKS IN THE THERMAL HYDRODEALKYLATION UNIT AS REQUIRED; 2) FAILURE TO EQUIP AN OPEN-ENDED VALVE WITH A CAP, BLIND FLANGE, PLUG, OR SECOND VALVE AS REQUIRED; 3) FAILURE TO PROPERLY MONITOR VALVES TO DETECT LEAKS IN THE AROMATICS EXTRACTION UNIT (AEU) AS REQUIRED; 4) FAILURE TO PROPERLY MONITOR PUMPS TO DETECT LEAKS IN THE AROMATICS EXTRACTION UNIT (AEU) AS REQUIRED; 5) FAILURE TO IDENTIFY EACH PIECE OF EQUIPMENT IN THE AEU AS REQUIRED; 6) FAILURE TO EQUIP AN OPEN-ENDED VALVE WITH A CAP, BLIND FLANGE, PLUG, OR A SECOND VALVE LOCATED IN THE AEU AS REQUIRED; 7) FAILURE TO PROPERLY MONITOR COMPONENTS TO DETECT LEAKS IN THE AEU AS REQUIRED; 8) FAILURE TO PROPERLY MONITOR VALVES TO DETECT LEAKS IN THE CATALYTIC REFORMING UNIT (CRU); AND 9) FAILURE TO PERFORM DAILY CALIBRATION DRIFT TESTS ON CONTINUOUS EMISSION MONITORING SYSTEMS (CEMS). 4. RELIEF SOUGHT PURSUANT TO SECTION 113 OF THE CAA, EPA SUBMITTED A DIRECT REFERRAL TO DOJ REQUESITNG PROSECUTORIAL ASSISTANCE FOR CIVIL VIOLATIONS ACTIONABLE UNDER SECTION 113 OF THE CAA AGAINST THE RESPONDENT. EPA IS SEEKING CIVIL PENALTIES AND INJUNCTIVE RELIEF FOR THE VIOLATIONS CITED AT THE FACILITY.
Created at
2026-10-02T02:02:59.061315+00:00
Updated at
2026-10-02T02:02:59.061315+00:00