establishing a commission to study the replacement of the peaker plant in Bow with a clean energy baseload generator and storage.
6 recorded connections shown. Select a record, office or person to follow its source references.
Start with
and connect to
Browse all held record sources
Zoom to read. Drag to explore. Select a connection.
The source record
The source did not record a date for this entry.
- Jurisdiction code
- NH
- Identifier
- HB 1289
- Number
- 1289
- Title
- establishing a commission to study the replacement of the peaker plant in Bow with a clean energy baseload generator and storage.
- Is law candidate
- true
- Current stage
- introduced
- Latest action at
- 2024-02-01T00:00:00+00:00
- Official url
- https://openstates.org/
- Source updated at
- 2024-12-04T06:06:56.365617+00:00
- First seen at
- 2026-09-02T01:24:59.975654+00:00
- Last seen at
- 2026-10-04T09:00:54.006698+00:00
- Metadata
- {}
- Government level
- state
Every link on this map
The same connections as a table, with the reason each one is here.
| Measures | What this connects to | establishing a commission to study the replacement of the peaker plant in Bow with a clean energy baseload generator and storage. has a recorded connection to Measures. | None |
| HB 1289: establishing a commission to study the replacement of the peaker plant in Bow with a clean energy baseload generator and storage | What this connects to | establishing a commission to study the replacement of the peaker plant in Bow with a clean energy baseload generator and storage. has a recorded connection to HB 1289. | None |
| New Hampshire 2024 | What this connects to | establishing a commission to study the replacement of the peaker plant in Bow with a clean energy baseload generator and storage. has a recorded connection to New Hampshire 2024. | None |
| New Hampshire | What this connects to | establishing a commission to study the replacement of the peaker plant in Bow with a clean energy baseload generator and storage. has a recorded connection to New Hampshire. | None |
| ocd-bill/b3003656-fa7f-407f-b2ce-ca9a18203819 | What this connects to | establishing a commission to study the replacement of the peaker plant in Bow with a clean energy baseload generator and storage. has a recorded connection to ocd-bill/b3003656-fa7f-407f-b2ce-ca9a18203819. | None |
| New Hampshire | What this connects to | establishing a commission to study the replacement of the peaker plant in Bow with a clean energy baseload generator and storage. has a recorded connection to New Hampshire. | None |