AB 1104
10 links on this map: who funds them, what they touched, and who lobbied on it. Select anyone to move the map to them.
Start with
and connect to
Browse all held record sources
Zoom to read. Drag to explore. Select a connection.
AB 1104
Net energy metering: construction of renewable electrical generation facilities: public works project requirements
California · Became law
Every link on this map
The same connections as a table, with the reason each one is here.
| Gail Pellerin | Sponsors | Gail Pellerin sponsored AB 1104. | None |
| Ameresco | Lobbied on it | Ameresco named AB 1104 in 1 lobbying report. | 1 report |
| California State Association of Electrical Workers | Lobbied on it | California State Association of Electrical Workers named AB 1104 in 1 lobbying report. | 1 report |
| Estriatus Law PC | Lobbied on it | Estriatus Law PC named AB 1104 in 1 lobbying report. | 1 report |
| International Brotherhood of Electrical Workers, Local 1245 | Lobbied on it | International Brotherhood of Electrical Workers, Local 1245 named AB 1104 in 1 lobbying report. | 1 report |
| International Brotherhood of Electrical Workers, Local 18 | Lobbied on it | International Brotherhood of Electrical Workers, Local 18 named AB 1104 in 1 lobbying report. | 1 report |
| International Brotherhood of Electrical Workers, Local 465 | Lobbied on it | International Brotherhood of Electrical Workers, Local 465 named AB 1104 in 1 lobbying report. | 1 report |
| International Brotherhood of Electrical Workers, Local 47 | Lobbied on it | International Brotherhood of Electrical Workers, Local 47 named AB 1104 in 1 lobbying report. | 1 report |
| International Brotherhood of Electrical Workers, Local 659 | Lobbied on it | International Brotherhood of Electrical Workers, Local 659 named AB 1104 in 1 lobbying report. | 1 report |
| Net energy metering: construction of renewable electrical generation facilities: public works project requirements. | Source records | AB 1104 has an explicit source reference to Net energy metering: construction of renewable electrical generation facilities: public works project requirements.. | None |
In the news
Reporting about the selected subject. Articles are context and do not establish a connection on this map.
Loading coverage…