S 3181: Permits solar electric power generation facility projects not having commenced…
6 links on this map: who funds them, what they touched, and who lobbied on it. Select anyone to move the map to them.
Start with
and connect to
Browse all held record sources
Zoom to read. Drag to explore. Select a connection.
S 3181
Permits solar electric power generation facility projects not having commenced commercial operation to retain designation through May 31, 2018 as connected to distribution system.
New Jersey · Became law
Every link on this map
The same connections as a table, with the reason each one is here.
| Reed Gusciora | Sponsors | Reed Gusciora sponsored S 3181: Permits solar electric power generation facility projects not having commenced…. | None |
| Wayne P. DeAngelo | Sponsors | Wayne P. DeAngelo sponsored S 3181: Permits solar electric power generation facility projects not having commenced…. | None |
| Bob Smith | Sponsors | Bob Smith sponsored S 3181: Permits solar electric power generation facility projects not having commenced…. | None |
| Timothy J. Eustace | Sponsors | Timothy J. Eustace sponsored S 3181: Permits solar electric power generation facility projects not having commenced…. | None |
| Patrick Diegnan | Sponsors | Patrick Diegnan sponsored S 3181: Permits solar electric power generation facility projects not having commenced…. | None |
| Permits solar electric power generation facility projects not having commenced commercial operation to retain designation through May 31, 2018 as connected to distribution system. | Source records | S 3181: Permits solar electric power generation facility projects not having commenced… has an explicit source reference to Permits solar electric power generation facility projects not having commenced commercial operation to retain designation through May 31, 2018 as connected to distribution system.. | None |
In the news
Reporting about the selected subject. Articles are context and do not establish a connection on this map.
Loading coverage…