AB 2465
3 links on this map: who funds them, what they touched, and who lobbied on it. Select anyone to move the map to them.
Start with
and connect to
Browse all held record sources
Zoom to read. Drag to explore. Select a connection.
AB 2465
Independent System Operator: reporting requirements
California · Failed
Every link on this map
The same connections as a table, with the reason each one is here.
| Northern California Power Agency | Lobbied on it | Northern California Power Agency named AB 2465 in 4 lobbying reports. | 4 reports |
| Southern California Public Power Authority | Lobbied on it | Southern California Public Power Authority named AB 2465 in 4 lobbying reports. | 4 reports |
| Independent System Operator: reporting requirements. | Source records | AB 2465 has an explicit source reference to Independent System Operator: reporting requirements.. | None |
In the news
Reporting about the selected subject. Articles are context and do not establish a connection on this map.
Loading coverage…

